Part V. COST ESTIMATES AND IMPLEMENTATION PHASING

Costs include employee salaries, operating expenses, materials and contract labor expenses.

Year after plan approval (dollars shown in thousands)

YEAR
2
ACTION 1 2 3 4 5 6 7 8 9 10 Total
1.1 OHV Trails 5 5 $10,000
1.2 Tot Lot 2 2 $4,000
1.3 Sand Drag 2 1 1 1 1 1 1 1 1 $10,000
1.4 Boat Ramp Trail 1 1 1 $3,000
1.5 4X4 Course 3 3 3 $9,000
1.6 Rider Map 2 2 $4,000
1.7 ATV Training 1 1 1 $3,000
1.8 Trail Widening 5 $5,000
1.9 Loop Trail 3 20 20 $43,000
1.10 Large Dunes 5 5 5 $15,000
1.11 Agreement 1 $1,000
1.12 Green Sticker 1 1 1 1 1 1 1 1 1 1 $10,000
1.13 OHV Permits $0
2.1 Sign Plan 1 $1,000
2.2 Jetty Rd. 10 $10,000
2.3 Map/Brochure 3 $3,000
2.4 Highway veh. $0
2.5 Patrols 10 10 10 10 10 10 10 10 10 10 $100,000
2.6 Separate Users 1 1 1 $3,000
2.7 Ped. Routes 1 $1,000
2.8 Flags $0
2.9 Speed Zone $0
2.10 Paving 15 15 $30,000
2.11 Brushing 1 1 $2,000
2.12 Grading 2 2 2 2 2 2 2 2 2 2 $20,000
3.1 Surfer ROW $0
3.2 Surfer Fac. $0
3.3 Parking 3 $3,000
4.1 Fees 1 $1,000
4.2 Fee Implement 5 $5,000
5.1 Monitor Plants 1 1 1 1 1 1 1 1 1 1 $10,000
5.2 Recovery Plan 1 $1,000
5.3 Exotic Plants 10 10 10 10 10 $50,000
5.4 Plant Trees 1 1 1 $3,000
5.5 Transplant $0
5.6 Interpretation 1 1 $2,000
5.7 Interpretation 5 3 3 $11,000
5.8 Barriers 1 1 1 1 1 $5,000
5.9 Patrols 10 10 10 10 10 10 10 10 10 10 $100,000
5.10 HSU $0
5.11 Lighthouse 1 $1,000
5.12 Wetlands $0
5.13 Monitor Veg. 1 1 1 1 1 1 1 1 1 1 $10,000
5.14 Monitor Plover 1 1 1 1 1 1 1 1 1 1 $10,000
5.15 Visitor Surveys $0
5.16 Monitor Act. $0
5.17 Signs 3 1 1 1 1 $7,000
5.18 Visitor Cap. $0
5.19 Caretaker 3 3 3 3 3 3 3 3 3 3 $30,000
6.1 Veg. Gather $0
6.2 Patrols 5 5 5 5 5 5 5 5 5 5 $50,000
6.3 Monitor 1 1 1 1 1 1 1 1 1 1 $10,000
6.4 Studies 2 2 2 $6,000
7.1 Peninsula Map 1 1 $2,000
7.2 Map/Brochure 2 2 $4,000
7.3 Signs 2 1 1 1 1 1 1 1 1 1 $11,000
7.4 Hiking Trail 2 2 2 2 2 $10,000
7.5 Interpretation 1 5 $6,000
7.6 Restrooms 12 12 12 $36,000
7.7 Drinking Water 2 $2,000
7.8 Facilities 2 2 2 2 2 2 2 2 2 2 $20,000
7.9 Fishing Pier 10 50 $60,000
8.1 Friends $0
8.2 Withdrawal $0
8.3 ACE $0
8.4 Adopt a Beach $0
8.5 Eureka Agree. 1 $1,000
8.6 Agreements $0
TOTALS 65 81 71 108 75 65 64 58 66 101 $754,000

Table of Contents
Next Section